Yokogawa Tabbed as Main Automation Contractor for Chevron Petrochem Project

Nov. 22, 2013

The project will include a 1.5 million metric tons/year ethane cracker and two new polyethylene facilities.

Yokogawa Electric Corporation has been selected as the main automation contractor for Chevron Phillips Chemical Company LP’s USGC Petrochemicals Project.

The project will include a 1.5 million metric tons/year (3.3 billion pounds/year) ethane cracker and two new polyethylene facilities, each with an annual capacity of 500,000 metric tons (1.1 billion pounds).

RELATED: Yokogawa Subsidiary to Provide Control System & Field Instruments for 2nd-Gen Bioethanol Plant in Brazil

The ethane cracker will be built at Chevron Phillips Chemical’s Cedar Bayou plant in Baytown, Texas, and two polyethylene units will be built at a site in Old Ocean, Texas near Chevron Phillips Chemical’s Sweeny plant.

The USGC Petrochemicals Project is expected to commence construction in early 2014 and create approximately 400 long-term direct jobs and 10,000 engineering and construction jobs.

“We are proud to be part of one of the first grassroots ethylene and polyethylene plants to be built in the U.S. in a very long time,” says Chet Mroz, president and CEO of Yokogawa Corporation of America.

Sponsored Recommendations

Learn how AW-Lake's Coriolis and Turbine Meters play a critical role in QCI-PCF's proprietary process, converting waste plastics into high-quality fuels and chemicals, and enabling...
Discover how AW-Lake's Gear Meters provide precise flow measurement for OEM semi-truck end-of-line filling stations, ensuring accuracy and efficiency in your operations.
Understand how TRICOR meters help optimize underbody protection in automotive production through accurate material delivery.
Watch how precision flow monitoring enhances print quality and minimizes material waste in high-volume operations.