Valve Maintenance: Preparing for Plant Outages

Oct. 10, 2014

Effective planning can save time and curtail expenses associated with the testing, repair, and replacement of control valves within the plant’s total value population.

Brought to you by Spirax Sarco

 

Spirax Sarco 1150 Northpoint Boulevard Blythewood, SC 29016Phone: 803 714-2000Fax: 803 714-2222[email protected]www.spiraxsarco.com/us
As production and utility plant areas prepare for upcoming maintenance turnaround (TAR), outages, and shut-downs, effective planning can save time and curtail expenses associated with the testing, repair, and replacement of control valves within the plant’s total value population. Effective planning is also a key component to smoothly managing both internal maintenance employees and externally contracted technicians that will be performing the work. Manpower resources make up a large portion of the total expenses associated with the outage so organization becomes just as important as those planning processes.