Valve Maintenance: Preparing for Plant Outages
Oct. 10, 2014
Spirax Sarco 1150 Northpoint Boulevard Blythewood, SC 29016Phone: 803 714-2000Fax: 803 714-2222[email protected]www.spiraxsarco.com/us
As production and utility plant areas prepare for upcoming maintenance turnaround (TAR), outages, and shut-downs, effective planning can save time and curtail expenses associated with the testing, repair, and replacement of control valves within the plant’s total value population. Effective planning is also a key component to smoothly managing both internal maintenance employees and externally contracted technicians that will be performing the work. Manpower resources make up a large portion of the total expenses associated with the outage so organization becomes just as important as those planning processes.