DoI Issues Blowout Prevention Requirement

June 21, 2010

The Department of the Interior reversed a prior agency decision that exempted many Gulf of Mexico oil and gas natural gas operations from having to submit plans to address

The Department of the Interior reversed a prior agency decision that exempted many Gulf of Mexico oil and gas natural gas operations from having to submit plans to address worst-case-scenario blowouts before drilling wells, according to a report by the Houston Chronicle. The order requires oil and gas companies to deal with the possibility of a blowout when filing new drilling permit requests, exploration plans or development plans, specifically detailing steps taken to prevent blowouts.

Other detailed information companies must provide includes:

  • An estimated flowrate, total volume, and maximum duration of a potential blowout.
  • A discussion of the likelihood that “surface intervention” would be needed to stop a blowout.
  • The availability of a rig to drill a relief well.
  • Estimates of the time it would take to contract for a rig and drill a relief well.

For the full Houston Chronicle report on this story, click here.

Sponsored Recommendations

Learn About: Micro Motion™ 4700 Config I/O Coriolis Transmitter

An Advanced Transmitter that Expands Connectivity

Micro Motion™ G-Series Compact, Drainable Coriolis Flow and Density Meters

Micro Motion G-Series Coriolis flow and density meters are ideally suited for Process Monitoring and Optimization applications, offering easy selection with pre-selected models...

Learn about: Micro Motion G-Series Coriolis Flow and Density Meters

The Micro Motion G-Series is designed to help you access the benefits of Coriolis technology even when available space is limited.

Micro Motion 4700 Coriolis Configurable Inputs and Outputs Transmitter

The Micro Motion 4700 Coriolis Transmitter offers a compact C1D1 (Zone 1) housing. Bluetooth and Smart Meter Verification are available.